No. | Customer | Year | Description |
---|---|---|---|
1 | Tvornica HEMPRO GRADAČAC | 1996 | Reconstruction of the system for automatic control of the technological process of the plant - PLANT FOR THE PRODUCTION OF BITUMEN INSULATION RACES In 1996, the company successfully completed a project for the reconstruction of sensor and control equipment at the HEMPRO Gradačac Factory, after which regular production for the market started at the factory. The reconstruction works last for one month. |
2 | FABRIKA SOLI TUZLA | 1996 | Reconstruction of the automatic control system Salt production plant The EHS and EPS actuators were reconstructed at the Soli production plant, as well as measuring equipment, pressure, flow, temperature, as well as testing and adjustment of measuring and control paths based on the SUPS 400 system manufactured by ENERGOINVEST Sarajevo. Upon completion of the aforementioned activities, the plant was successfully commissioned into the production cycle. |
3 | TERMOELEKTRANA TUZLA | 1997 | Reconstruction of measuring and control equipment on BLOCK 3, Boiler 3 and Boiler 4 in Tuzla Thermal Power Plant This project includes works on the reconstruction of pressure sensing equipment, subpressure itemperature as well as actuator EPS equipment on boilers 3 and 4 in the Tuzla Thermal Power Plant. Upon completion of these tasks, Block3 was successfully synchronized to the network. |
4 | TERMOELEKTRANA TUZLA | 1997 | Reconstruction of control equipment at BLOCK 6, Boiler 7 at Tuzla Thermal Power Plant This project covers the overhaul of all EHS i EPS drives on Unit 6, power supplies, testing of control and signal circuits, tuning and commissioning. Upon completion of the aforementioned activities, the Contracting Authority placed BLOCK 6 undisturbed in the production process. |
5 | MLJEKARA Tuzla Tuzla | 1997 | Delivery, design, programming, installation and commissioning of PLC Control equipments and OP 35 panels for visualization of milk sterilization plant in the factory MLJEKARA dd Tuzla This project covers the delivery, installation and commissioning of an office system for the control and visualization of a milk sterilization plant. Upon termination of these activities, MLJEKARA dd Tuzla is the first to place long-lasting milk in TETRA-PAK packaging on the market. |
6 | FABRIKA SOLI TUZLA | 1998 | Reconstruction of the system for measuring the level and automatic drainage of brine Delivery and installation of equipment for level measurement and control (PLC + OP) for automatic drainage of salty slurry from collection mixers was carried out in the part of the Soli production plant. |
7 | FABRIKA CEMENTA LUKAVAC | 1999 | Delivery, design, installation and commissioning of monitoring and control systems for MLIN CEMENT (PLC + SCADA) This project covers the delivery, design, programming of the PLC and SCADA systems, sensor equipment for measuring temperature, pressure and flow and providing access to the engineers 300 m from the plant to supervise the MLINA cement plant through the engineering station. |
8 | TERMOELEKTRANA TUZLA | 1999 | Reconstruction of control equipment at BLOCK 5, Boiler 6 at Tuzla Thermal Power Plant This project covers the overhaul of all EL. Servo drives on Unit 5, power supplies, control and signal circuits testing, tuning and commissioning. Upon completion of the aforementioned activities, the Contracting Authority placed BLOCK 5 undisturbed in the production process. |
9 | TVORNICA CEMENTA KAKANJ | 2001 | System for automatic control of bag filters in TCK-Kakanj PLC equipment for automatic bag filter control at the Kakanj Cement Factory has been delivered, assembled and put into operation. |
10 | JP ELEKTROPRIVREDA HRVATSKE ZAJEDNICE HERCEG BOSNE d.d.MOSTAR | 2002 | Production and delivery of lighting TOTEM for the needs of JP ELECTRICITY Herceg-Bosna MOSTAR With this project, the design, production and installation of the luminous TOTEM for the needs of JP ELECTRICITY OF THE CROATIAN COMMUNITY HERCEG BOSNIA d.d. MOSTAR in Mostar. |
11 | MLIN LJUBAČE DD, LJUBAČE | 2002 | Production and delivery of luminous TOTEMA for the needs ofMLIN LJUBAČE DD, LJUBAČE With this project, the design, production and installation of the luminous TOTEM for the needs of MLIN LJUBAČE DD, LJUBAČE |
12 | ENERGOINVEST DD SARAJEVO | 2002 | Testing, adjusting and issuing of test protocols measuring and regulating equipment installed on the basis of structural design of Unit 4 in TPP Tuzla As a subcontractor, our company has performed testing, tuning and commissioning of metering and control equipment installed under the contract for the reconstruction of Automatiken Block 4 between JP ELEKTROPRIVRED BIH and SIEMENS. |
13 | TERMOELEKTRANA TUZLA | 2002 | PLC SIMATIC S7 200/300/400 controller training course Execution of training programs for thermal power plant engineers programming PLC SIMATIC S7 200/300/400. |
14 | TERMOELEKTRANA TUZLA | 2002 | Reconstruction of the Chemical Water Preparation (HPV) measurements at TPP Tuzla The work included the development of a Synoptic Panel and the upgrades necessary for the operation of the plant. |
15 | TERMOELEKTRANA TUZLA | 2002 | Delivery and installation work of sensor and equipment level visualization on cooling tower Block 6 at TE Tuzla The work involved the delivery and installation of equipment for measuring and visualizing the water level in the cooling tower of Unit 6 at TE Tuzla. |
16 | TERMOELEKTRANA TUZLA | 2002 | Design, programming, assembly and commissioning of BENTLY NEVADA equipment for special measurements on turbine BOKA 3 in TPP Tuzla This project covers the implementation of the monitoring equipment for the 100 MW turbo-generating unit on Unit 3 at the Tuzla Thermal Power Plant. The sensing equipment included the following special measurements on turbine unit Bl.3: rpm measurement measurement of axial displacement of turbocharger shaft measuring the eccentricity of the turbocharger shaft measuring the relative expansion of the VP housing measuring the relative expansion of the NP casing PLC Controller Bently Nevada was installed and its programming and commissioning performed. Monitoring and archiving of measurements was provided via an industrial PC. |
17 | KLAS DD, SARAJEVO | 2003 | Construction of system for automatic control of pneumatic transport of flour in Klas DD Sarajevo. Project includes delivery of equipment, design and programming of system and commissioning of system of pneumatic transport of flour. |
18 | KLAS DD, SARAJEVO | 2003 | System upgrade via Annex This Annex covers additional activities for upgrading the automatic control system for pneumatic flour transport at KLAS dd Sarajevo. |
19 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2003 | Automation of coal preparation and coke separation plant automation. This project has carried out the design, programming and delivery of PLC equipment and SCADA systems for monitoring and control of the coal preparation and transportation plant for the extraction and transpot of coke at Global Ispat Koksna Industrija Lukavac. |
20 | TERMOELEKTRANA TUZLA | 2003 | Annual maintenance of PLC controllers at auxiliary plants in TPP Tuzla This contract takes over the activities of the regular monthly maintenance of the PLC controller on an annual basis on the principle of maintaining the plant's operational readiness and response within 2 hours upon the Client's invitation. |
21 | TERMOELEKTRANA TUZLA | 2003 | Maintenance of equipment in the field for local measurements This contract covers the maintenance of equipment in the field for local pressure and temperature measurement. |
22 | TERMOELEKTRANA TUZLA | 2003 | Installation and commissioning of radio communication systems in TPP Tuzla This contract covers the implementation of radio communication equipment. |
23 | TERMOELEKTRANA TUZLA | 2003 | PLC Programming Training Course With this contract, the tasks of conducting the course - training of TPP engineers for PLC programming - Course No. 1 were performed. |
24 | TERMOELEKTRANA TUZLA | 2003 | Maintenance of equipment in the field on the Block 6 This contract covers the maintenance of equipment in the field for remote measurement of pressure and temperature. |
25 | TERMOELEKTRANA TUZLA | 2003 | PLC Programming Training Course With this contract, the tasks of conducting the course - training of TPP engineers for PLC programming - Course No. 2 were performed. |
26 | PSP Engineering a.s | 2003 | Designing software applications With this contract, the programming of the PLC controller for the needs of the Cement Factory Lukavac was performed. |
27 | DELING doo, Tuzla | 2003 | Construction of a metering and control system at a central heating plant This project covers the design, programming, delivery, installation and commissioning of system monitoring and control of the heating facilities of the city of Tuzla and Lukavac. |
28 | TVORNICA CEMENTA KAKANJ | 2003 | System for automatic control of bag filters in TCK-Kakanj PLC equipment for automatic bag filter control at the Cement Factory Kakanj was delivered, assembled and put into operation. |
29 | TERMOELEKTRANA TUZLA | 2004 | Development of new Management Algorithms on Unit 4 at TPP Tuzla This contract has completed the work of developing new control algorithms on the Block 4 system. |
30 | TERMOELEKTRANA TUZLA | 2004 | Annual maintenance activities of ECO - MONITORING in TPP Tuzla This contract takes over the tasks of regular monthly maintenance of the ECO-MONITORING system on an annual basis according to the principle of maintaining the plant's operational readiness and response within 2 hours upon the Client's invitation. |
31 | TERMOELEKTRANA TUZLA | 2004 | Annual maintenance of PLC controllers at auxiliary plants in TPP Tuzla This contract takes over the activities of the regular monthly maintenance of the PLC controller on an annual basis on the principle of maintaining the plant's operational readiness and response within 2 hours upon the Client's invitation. |
32 | SIEMENS DOO Sarajevo | 2004 | Construction of a system for management and visualization of the Salakovac Hydro Power Plant With this contract, the construction and supervision of the HPP Salakovac was performed on behalf and for the account of SIEMENS DOO Sarajevo. |
33 | SIEMENS SARAJEVO | 2005 | Signal preparation jobs for TXP deployment This contract has carried out the work of preparing and adjusting the measuring signals of the flow, pressure and temperature of process steam for displaying them on the TXP system for the needs of TPP Tuzla. |
34 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2005 | Upgrading of the second phase automation system at Coal Preparation This contract completed the operations of upgrading the management and control system at the coal preparation plant. Tape sensors, level sensors in coal bunkers and coke bunkers are installed, as well as an 8-channel CCTV video surveillance system. |
35 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2005 | PLC Control and visualization equipment for electric motor drives at the Energana plant This contract covers the tasks of designing, programming, delivery, installation and commissioning of systems for control and visualization of electric motor valves at Energy. |
36 | TERMOELEKTRANA TUZLA | 2005 | Delivery, installation and commissioning of frequency regulators on HPV in TPP Tuzla The contract included the tasks of delivery, installation, parameterization and commissioning of frequency regulators at the Chemical Water Preparation at TPP Tuzla. |
37 | DELING DOO, Tuzla | 2005 | Monitoring and control system (PLC and WinCC) for the transport facility This contract covers the design, programming, delivery, installation and commissioning of systems and automatic plant control for the needs of Amfibolit Vareš. |
38 | DELING DOO, Tuzla | 2005 | PLC delivery and programming jobs This contract has completed the delivery and programming of the PLC for the needs of Mercator Sarajevo. |
39 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2005/2006 | Design, programming, delivery, installation and commissioning of automatic control equipment for BUTAN station This project covers the design, programming, delivery, installation and commissioning of automatic control of the BUTANSKA STANICA plant within the GLOBAL ISPAT COKE INDUSTRY LTD. |
40 | TERMOELEKTRANA TUZLA | 2005 | Annual maintenance of PLC devices in TPP Tuzla This contract takes over the activities of regular monthly maintenance of the PLC devices on an annual basis on the principle of maintaining the plant's operational readiness and response within 2 hours upon the Client's invitation. |
41 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2006 | Design, programming, delivery, installation and commissioning of computer control equipment for the N-BUTANE MALEIC ACID Anhydride production plant This project covers the design, programming, delivery, installation and commissioning of computer-controlled systems for the production of N-BUTANE MALEIC ACID ANHYDRIDE in the GLOBAL ISPAT COKE INDUSTRY LTD. |
42 | TERMOELEKTRANA TUZLA | 2006 | Annual maintenance of PLC devices in TPP Tuzla This contract takes over the activities of regular monthly maintenance of PLC devices on an annual basis on the principle of maintaining the plant's operational readiness and response within 2 hours upon the Client's invitation. |
43 | PLAMINGO d.o.o. Gračanica | 2006 | Design, programming, delivery, installation and commissioning of automatic control equipment WASTE WATER TREATMENT PLANT This project covers the design, programming, delivery, installation and commissioning of computerized wastewater treatment plant. |
44 | TERMOELEKTRANA TUZLA | 2006 | Delivery of equipment and spare parts for measurement and regulation of Unit 6 in TPP “Tuzla” |
45 | TERMOELEKTRANA TUZLA | 2007 | Annual maintenance of PLC devices in TPP Tuzla This contract takes over the activities of regular monthly maintenance of PLC devices on an annual basis on the principle of maintaining the plant's operational readiness and response within 2 hours upon the Client's invitation. |
46 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2007 | Annual maintenance of automatic control systems This contract takes over the tasks of regular monthly maintenance of the automatic control system on an annual basis according to the principle of maintaining the plant's readiness: coal preparation, separation of coke, power plants, factory for production of n-butane anhydride, as well as response within 2 hours upon invitation of the Client. |
47 | TVORNICA CEMENTA KAKANJ | 2007 | Design, programming, delivery, installation and commissioning of storage terminals and cement distribution in Banja Luka This project covers the design, programming, delivery, installation and commissioning of automatic control and visualization of cement storage and distribution terminals. |
48 | TERMOELEKTRANA TUZLA | 2007 | Delivery of equipment and spare parts for measurement and regulation of Unit 6 in TPP “Tuzla” |
49 | TVORNICA CEMENTA KAKANJ | 2007 | Delivery, installation and commissioning of furnace sheath temperature measuring systems |
50 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2007 | Design, delivery, installation and commissioning of video surveillance systems Design, delivery, installation and commissioning of video surveillance systems at the coal preparation plant. |
51 | ARCELORMITTAL ZENICA | 2007 | Modernization of electric motor drives and automation of the coke plant department Engineering, design, procurement of equipment and materials, delivery, commissioning, commissioning and oversight of automation and instrumentation jobs at the complete coke plant and by-products. |
52 | OPĆINA TUZLA Služba za komunalne poslove, izgradnju i poslovemjesnih zajednica | 2007 | Development of a project of stationary traffic in the city of Tuzla with the proposal of a system of payment and control The project of stationary traffic in the city of Tuzla with the proposal of a system of payment and parking control in order to solve the problems of stationary traffic and to improve the existing system of parking lots and the payment of parking and control of the parking. a comprehensive parking space solution, the technological solution and the organization of the radar parking service have been designed. |
53 | OPĆINA TUZLA Služba za komunalne poslove, izgradnju i poslovemjesnih zajednica | 2007 | Design of a project for automatic traffic management system in Tuzla Design of a project for the automatic traffic management system (AUS) in the city of Tuzla that represents the solution of the traffic problem of the city of Tuzla and the solution of the system for automatic traffic management. The system was designed for 22 traffic lights and 3 new junctions where traffic lights need to be set up. The project covers the analysis of the existing traffic organization, defines the equipment for the control and control center, traffic lights, video surveillance at certain intersections, as well as the traffic part, electrical part, construction part and plans for the new three intersections. |
54 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2008 | Design, programming, delivery, installation and commissioning of equipment for automatic control of the transport system for the delivery of materials of the KAN old and new packaging system This project covers the design, programming, delivery, installation and commissioning of systems and the automatic control of the transport system for the delivery of old and new packaging materials and the connection of the alarm system and status with packaging, palletizing and packaging machines. |
55 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2008 | Annual maintenance of automatic control systems This contract takes over the tasks of regular monthly maintenance of the automatic control system on an annual basis according to the principle of maintaining the plant's readiness: coal preparation, separation of coke, power plants, factory for production of n-butane anhydride, as well as response within 2 hours upon invitation of the Client. |
56 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2008 | Design, delivery, installation and commissioning of video surveillance systems Design, delivery, installation and commissioning of video surveillance systems at KAN's old and new packaging plant. |
57 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2008 | Signal preparation for NOx gas monitoring Design, installation and commissioning of the necessary measurements for the NOx gas analyzer. The preparation of old pneumatic signals in the milliampere signal range was performed. All work was done while the plant was in operation while the control and management system remained fully independent. |
58 | TERMOELEKTRANA TUZLA | 2008 | Annual maintenance of PLC devices in TPP Tuzla This contract takes over the activities of regular monthly maintenance of PLC devices (S7 300, Bently Nevada and Allan Bredley) on an annual basis according to the principle of maintaining the plant's operational readiness and response within 2 hours upon the Client's invitation. |
59 | GLOBAL ISPATKOKSNA INDUSTRIJAd.o.o. LUKAVAC | 2008 | Design, programming, delivery, installation and commissioning of measurement, control, control and video surveillance equipment This project covers the design, programming, delivery, installation and commissioning of equipment for measuring, regulating, controlling and video surveillance of the Azotare facility: 313, 314, and 311. |
60 | TERMOELEKTRANA TUZLA | 2008 | Replacement of electrical equipment of the Coal Supply Command of Stage III and Stage IV at TPP Tuzla This project covers the work of designing and designing an automatic control system as well as programming the PLC controller. Design, delivery and installation of communication terminals for collecting and transmitting signals from the plant, as well as delivery and installation of measuring equipment for data acquisition, as well as installation of coupling equipment and cables for connecting the system of automatic control elements. |
61 | TERMOELEKTRANA TUZLA | 2009 | Delivery of spare parts for automation of Unit 5 for the needs of the Branch of Tuzla Thermal Power Plant Tuzla |
62 | TERMOELEKTRANA TUZLA | 2009 | Delivery of spare parts for automation of units 4 and 5 for the needs of the Tuzla Thermal Power Plant Branch Tuzla |
63 | ZADA pharmaceuticals d.o.o. LUKAVAC | 2009 | Design, programming, delivery, installation and commissioning of HVAC system automatic control equipment This project covers the procurement and delivery of measuring and control equipment in the field, PLC and HMI equipment, switchgear and control cabinets. Programming and development of PLC programs and algorithms, designing and designing SCADA systems, as well as development of project documentation functional testing and commissioning of the entire office system. |
64 | GLOBAL ISPATKOKSNA INDUSTRIJAd.o.o. LUKAVAC | 2009 | Design, Programming, Delivery, Installation and Commissioning of Automatically Controlled Gas Suction Equipment 2 and 3 The control and automation system over 6kV motors, which serve to extract coke oven gas from the coke oven battery No. 5, has been successfully commissioned and as such flawlessly functions in accordance with the technical and technological requirements, quality and deadlines of the customer. |
65 | TERMOELEKTRANA TUZLA | 2009 | Reconstruction of the control system for generator, excitation system and own consumption units of Unit 3 in TPP Tuzla (Unit III electrocommand) This project covers the delivery of measuring and control equipment, an operating system with associated hardware and software, programming of controllers and SCADA systems, disassembly and installation of measuring and control equipment. |
66 | TERMOELEKTRANA TUZLA | 2009 | Reconstruction of electrical equipment of wagon reverser no. 2 and 3 in TPP Tuzla This project covers the delivery of measuring and control equipment, hydraulic equipment and power equipment, preparation of preliminary and main design, disassembly and installation of equipment, and functional testing. |
67 | GLOBAL ISPATKOKSNA INDUSTRIJAd.o.o. LUKAVAC | 2009 | Design, delivery, installation and commissioning of the 7MW steam turbine parameter measurement system at the Energana-GIKIL plant This project covers the work of designing, delivering, assembling and commissioning of the 7MW parameter measuring turbine system, equipment for special measurements on the turbine. Design, delivery, installation and commissioning of PLC equipment for connection to the existing system, as well as the commissioning of HMI equipment. |
68 | TERMOELEKTRANA TUZLA | 2010 | Procurement of pump station and control system for Units 5,6 and 7 at TPP Tuzla This project covers the delivery of two water cannons, an appropriate monitoring and control system, the necessary additional equipment, and the commissioning of the screen repelling system on the boiler 5 and 6. |
69 | JAVNO PREDUZEĆE ZA VODOPRIVREDNU DJELATNOST “SPREČA”d.d. TUZLA | 2010 | Modernization of equipment intended for management of the multi-purpose water management system "Modrac" This project covers the construction, delivery, installation and commissioning of modern equipment for management of the water management system "Modrac". The old control panel was replaced with a modern control system. |
70 | SISECAM SODA LUKAVAC | 2010 | Infrared gas analyzer system This project covers the delivery, installation, testing and commissioning of INFRARED GAS ANALYZER-LIME KILN GAS and INFRARED GAS ANALYZER - WET SECTION GAS. |
71 | AC DC- KOS | 2010 | Reconstruction of the Power Supply and Automation System at the DISPOSAL / DETERMINATION I and II Plant, Coal Supply at the TPP Kosovo A Engineering, programming, cabinet wiring, delivery, on-site assembly, commissioning, staff training on the Disposer / Detachment I and II. |
72 | JAVNO PREDUZEĆE ZA VODOPRIVREDNU DJELATNOST “SPREČA”d.d. TUZLA | 2010 | Procurement, delivery, installation and commissioning of equipment for observation of Modrac Dam in Modrac This contract covers the procurement, delivery, installation and commissioning of equipment for monitoring the Modrac Dam in Modrac, in a rehabilitated state in order to preserve the completed works on the rehabilitation of the Modrac Dam, Municipality of Lukavac - Phase II, rehabilitation of vaults number 10, number 9 and part 8 of the vault. |
73 | ARCELORMITTAL ZENICA | 2010/ 2011 | Design and delivery of cabinets for the operation of the Coke oven gas purification system in the Koksar department and training of staff This contract covers the design, design, automation, installation, testing and monitoring of the coke oven gas treatment plant in the Koksara department as well as the training of personnel. |
74 | ARCELORMITTAL ZENICA | 2010/2011 | Technical support at SIEMENS Automation Systems in the Department of Coke monthly tour of the plant, inspection and diagnostics of process and control equipment, preparation of a detailed report on the condition of the equipment, deficiencies and proposals for improvements, assisting local staff in rectifying deficiencies, arrival at the intervention on call within max. 3 hours. |
75 | GLOBAL ISPAT KOKSNAINDUSTRIJA LUKAVAC | 2011 | BIG-BAG mineral fertilizer packaging video surveillance project This contract covers the design, programming, delivery, installation and commissioning of automatic control systems and video surveillance systems for BIG-BAG mineral fertilizer packaging at the New GIKIL Packaging Plant. |
76 | TERMOELEKTRANA TUZLA | 2011 | Annual maintenance activities of the PLC controller of the Block in TPP Tuzla This contract takes over the activities of regular monthly maintenance of the PLC controller on an annual basis according to the principle of maintaining the plant's operational readiness and response within 2 hours by the name of the Client. |
77 | ELEKTROPRIVREDA HZ HERCEG BOSNE dd MOSTAR | 2011 | Delivery of spare parts This Agreement covers the delivery of spare parts for electrical systems: monitoring, control, measurement, signaling, protection and excitation and voltage regulation for: CHE Čapljina HPP Peja Milini HPP Mostar HPP Rama HPP Jajce 1 HPP Jajce 2 Production Management Sector - CUP Mostar. |
78 | TERMOELEKTRANA TUZLA | 2011 | Delivery of spare parts This Agreement covers the delivery of materials, spare parts for the maintenance of technological measurements of regulations and management. |
79 | TERMOELEKTRANA TUZLA | 2011 | Reconstruction of hydraulic and electrical installation with combined dump, system B loader at TPP Tuzla Tuzla This project covers the work of project development, delivery of installation and commissioning of equipment for reconstruction of hydraulic and electrical installation on a combined landfill, system B loader at TPP "Tuzla" Tuzla. |
80 | ARCELORMITTAL ZENICA | 2011/2012 | Technical support at SIEMENS Automation Systems in the Department of Coke monthly tour of the plant, inspection and diagnostics of process and control equipment, preparation of a detailed report on the condition of the equipment, deficiencies and proposals for improvements, assisting local staff in rectifying deficiencies, arrival at the intervention on call within max. 3 hours. |
81 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2011 | Transport system COKE AND PHASE DISPOSAL Delivery, installation and commissioning of equipment for automation and connection of conveyors to the coal supply system and coke separation system. |
82 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2011 | System for the purification of coke oven gas at the Coke plant in Lukvac Within the framework of this contract, the following has been done: Designing, delivery, assembly works and commissioning of the coke oven gas purification system at the Coke plant in Lukavac, which includes the following: Oxygen analysis system in the coke oven field; System for control and control of electrostatic electrostatic precipitators; Construction reconstruction of the premises to accommodate the new control and management system; Mechanical work on the electrostatic precipitator plant and Actuators for front, behind and bypass of the electrostatic precipitator with power, control and control system. |
83 | ELEKTRODISTRIBUCIJA TUZLA | 2011 | Design of the main design of the reconstruction of the automatic control, control and control system of the Modrac SHPP This contract covers the development of the main design for ED Tuzla, which includes the reconstruction of the automatic control, monitoring and control system of the Modrac SHPP. The terms of reference, the scope of the project, the functional representation and description of the projected system, the technical solution of the system with detailed technical descriptions of individual system elements, block diagrams of system configuration, maps and plans, the project of regulation, management and supervision of SHPP, the plan of realization of the Project, and a description of the procedure acceptance testing. |
84 | HIDROELEKTRANE NA NERETVI JABLANICA | 2011-2012 | Reconstruction of the 0.4 kV plant at the Jablanica HPP Under this agreement, which was made in consortium with Deling d.o.o. Tuzla, Elcom d.o.o. has done the following works: Design of 0.4 kV plant; Procurement and installation of remote monitoring and control equipment; Connecting and parameterizing remote monitoring equipment and control of the 0.4 kV plant, as well as functional testing, adjustments, staff training and trial operation of the 0.4 kV plant, control and monitoring system. |
85 | JAVNO PREDUZEĆE „RAD“ D.D. TEŠANJ | 2012 | Introduction of a system of protection of pumps against the operation of dry overflow signaling at the Jevadzija reservoir Delivery, installation, parameterization and commissioning of equipment for the System of protection of pumps against dry running and overflow signaling at the Gospel reservoir. |
86 | KRUŠNOHORSKÉ STROJÍRNY KOMORANY | 2012 | Production, delivery, installation and putting into operation of the electrical part of the Disposal / Loader Delivery of switch-gear equipment, trust cabinet and terminals, machine cabin, audit services, instruction manual service, machine operator training. |
87 | ARCELORMITTAL ZENICA | 2012 | Procurement of a new torch control system in high furnace - Delivery of new self-ignition pilot burners; Delivery of new flame detectors; Delivery of a new logic-control system for automatic torch ignition, flame detection (flow chart for pilot burner functionality and flame sensors to provide AMZ with the necessary PLC program on the existing PLCU); Interface and lock with existing torch actuators for flow control; Regulating actuator for flaps on ch. UPS burners for uninterrupted power supply with 7.5 kVA battery, 60 min. |
88 | USAID/3EEE | 2012 | System for remote reading of energy consumption Gymnasium Mostar - Replacement of the module on the water meter and laying of a signal cable from the boiler room through the school yard to the shaft, which houses the water meter in an alkatene tube to a depth of 25 cm, a domestic device with IP68 housing protection connected to the module on the water meter. . ISKRA meters for remote reading of el. - Connecting devices to the M-Bus control panel, prepares and adjusts the software for reading the measurements. Prepare .csv and .xlsx files to send to ISGE and 3E (USAID), set up automatic power consumption readout, and send all requested files automatically. |
89 | TERMOELEKTRANA KAKANJ | 2012 | Implementation of air and water flow balancing system at the Branch of the Kakanj Thermal Power Plant Kakanj Design of the main project; Installation of signal conditioning cabinets and their power supply; Supply of water flow meters and connection with signal conditioning cabinets; Connecting a signal conditioning cabinet via an optical ring to a server; Installation and setup of servers and connection to the existing network of TPP Kakanj; Installation of Field Viewer SPV 10 software package; Commissioning of the system; Training of maintenance staff to work on said system; Design of a derivative project. |
90 | JAVNO PREDUZEĆE ZA VODOPRIVREDNU DJELATNOST “SPREČA”d.d. TUZLA | 2012 | Procurement and installation of an automatic water meter station for measuring the level and parameters of water quality of the Modrac reservoir at the entrance to the catchment building of the VSS "Modrac" This project covers the following tasks: - Procurement, delivery, installation, adjustment and connection of an automatic water meter system for measuring the level and water quality parameters of the Modrac reservoir at the entrance to the Modrac VSS capture facility, based on the principle of "In situ" measurements; - Delivery, production and installation of the supporting structure; - Binding, programming and design of the application in the existing system of management and control of VSS Modrac; - staff noise; -Project design documentation, 3 hard copies and 1 digital (CD). |
91 | TOM-CAT d.o.o. TUZLA | 2012-2013 | Rehabilitation of Modrac Dam - Phase III This project covers the following tasks: - Procurement and delivery of all necessary hardware equipment (servers, cables, switches, connectors ...); - Procurement and delivery of all necessary licensed software (for server and clients): - Installation installation work during installation servers and cabling; -Engineering (software installation, application design migration, communication settings ...); -Engineering work on unification of visual inspection data on visualization phase I and II of the Modrac Dam; -Functional testing and system commissioning; - Training of operators and maintenance staff. |
92 | ZRE KATOWICE S.A. | 2012-2013 | Delivery of equipment and works related to the overhaul of the boiler at the Tuzla Thermal Power Plant -Installation and connection of equipment for steam and water blowers, oil burners and flame control systems, in accordance with customer specifications and requirements; - Functional testing, installation and commissioning of equipment. |
93 | ALSTOM POWER SP. Z.O.O. POLAND | 2012-2013 | Delivery of equipment and works related to the overhaul of the turbine at the Tuzla Thermal Power Plant -Purchase, delivery and installation of cables; -Services related to the production of cable lines, laying and connecting cables from measuring devices to switchboards; -Functional testing of work performed. |
94 | DELING D.O.O. | 2012-2013 | Delivery of equipment and works on realization of Project "RBL6-TET-4.2.3 / 11 Replacement of electrostatic precipitators with modernization of slag and ash transport systems of block 6-215 MW in TPP" Tuzla " - This project includes the delivery and installation of a Control Cabinet for Electric Motors and heaters with a PLC S7400controller and a sufficient number of input / output modules, CP communication modules for communication with DCS and controllers of the OP 277 rectifier units with programming; monitoring electrostatic precipitators; -Installation of control and monitoring equipment. |
95 | ENERGOINVEST D.D. SARAJEVO | 2012-2013 | Design, procurement, delivery, installation, connection and commissioning of the control system for modernization of the slag and ash transport systems of the 6-215MW block at the Tuzla TPP -Design, procurement, delivery, installation, cabling, testing and commissioning of measuring equipment; -Design, procurement, delivery, installation, cabling, testing and commissioning of video surveillance, telephony and fire alarm systems; -Design, procurement, production , delivery, installation, cabling, testing and commissioning of the automation and control system, delivery of the 11kW frequency converter, connection and commissioning of the other four frequency converters to the Automation System; in technological protection on the slag transport system; |
96 | TERMOELEKTRANA TUZLA | 2012-2013 | Revitalization and modernization of metering and control equipment and control system of Unit 6 - 215 MW in TPP Tuzla This project covers: Measurements (pressure, temperature, levels and flows), Actuation (AUMA, Valves, on / off switches, pumps), Special turbine measurements (Bently Nevada). It also covers the delivery of signal cables (more than 60 kilometers of cable), production of DCS cabinets, production of continuous uninterrupted power supply 380/220 / 24VDC, assembly works (measurements, switches), dismantling of old measuring equipment on block 6 and development of the main software project design (80% of DCS). The project included HW and SW design, design, procurement, delivery, installation and commissioning of functional control and control equipment and control system of 6-215MW unit in TPP Tuzla.DCS project included revitalization and modernization of control equipment and control system of 6- 215 MW Unit in Tuzla Thermal Power Plant. The scope of the project included: (Engineering, Programming, Production, Installation, Delivery, Commissioning) Local Measurements 300 DCS Measurements 1500 640 Signals 9000 + Redundants MFC 3000 Units 9 Video the walls of the OPC and RTDSHMI Engineering Station Operator Station Servers. |
97 | TERMOELEKTRANA TUZLA | 2012-2013 | Amendment 1 to the Treaty: Revitalization and modernization of measuring and control equipment and control system of block 6 - 215 MW in TPP Tuzla - Development of project documentation and engineering; -Installation of monitoring equipment for T6 block transformer; -Installation of equipment for the implementation of video surveillance systems; installation of video surveillance system implementation equipment. |
98 | TERMOELEKTRANA TUZLA | 2012-2013 | Adaptation and arrangement of the block command block 6-215MW in TPP Tuzla This project covers the following jobs: Engineering; Design of dismantling project; Making a base project; Design of the main project; Design of the projected state; education and training of the staff of TPP Tuzla. The works include: installation of equipment and materials, construction of the building and repair of the command hall; installation of equipment for air-conditioning and heating of the command room; installation of equipment for replacement of lighting systems and emergency lighting; installation of equipment for replacement of the fire alarm system, and installation of equipment for replacement of the Interphony and Telephony systems. |
99 | SISECAM SODA LUKAVAC | 2013 | Installation of SCADA system for monitoring the performance of Aerzen 1 and Aerzen 2 screw compressors Delivery of necessary equipment and installation of SCADA system for monitoring the operation of Aerzen 1 and Aerzen 2 screw compressors together with their control cabinets PLC S7-300 and OP277 was made within the framework of this contract. |
100 | TERMOELEKTRANA TUZLA | 2013 | Delivery of silencers This contract will be the delivery of sound attenuators for boiler safety valves of quality requirements: BBM Akustik Technologie GmbH. This contract also includes test reports, NDT reports, operating and maintenance instructions, safety instructions, drawings and technical specification. |
101 | TERMOELEKTRANA TUZLA | 2013 | Procurement and installation of water cannons and related equipment for boiler 6 in TPP Tuzla The contract covers the development of a project for the installation of water cannons (mechanical, electrical and automation project), the final version of the software in the form of a fully functional project, mechanical and electrical installation, corrosion protection of installed positions, hot / cold testing and adjustments, and commissioning and training of personnel . Also supplied will be a WLB-CB 100 water cannon with fitting kit and associated sensors, local control cabinet, piping for machine and equipment connection that will extend from the pumping station to water cannons, cables for connecting water blowers to local control cabinets as and connecting to an existing command and control cabinet. Appropriate assembly documentation and installation instructions will be provided in English and a spare parts list will be provided with the documentation. |
102 | SISECAM SODA LUKAVAC | 2013 | Delivery and installation of electrical installations for Limestone 5 This contract covers delivery of distribution boxes, installation of distribution boxes and connection, delivery of cable shelves, production of cable strips. Also included are cable delivery, cable laying, lamps and power supplies, lighting installation, delivery of lightning protection material, grounding and IP, lightning protection installation, grounding and IP, and supply of additional materials and final measurements and tests. |
103 | TERMOELEKTRANA TUZLA | 2013 | Procurement of materials and spare parts for maintenance of technological measurements and control circuits This Agreement covers the delivery of materials, spare parts for the maintenance of technological measurements and regulatory circuits. |
104 | TERMOELEKTRANA TUZLA | 2013 | Delivery of spare parts and parts for electrical protection, drives and plants This Agreement covers the supply of spare parts for idols for electrical protections, plants and plants. |
105 | JP ELEKTROPRIVREDA BIH D.D. SARAJEVO | 2013 | Development of the Main Project “Reconstruction of the Existing System of Automatic Regulation and Control of SHPP Krusnica in Function of DNiU Aggregates” This contract includes Development of the Main design and project documentation "Reconstruction of the existing system of automatic regulation and control of SHPP Krusnica in function of DNiU aggregates". |
106 | SISECAM SODA LUKAVAC | 2013 | Delivery and installation of SBB conveyor wiring This contract covers the delivery of cable trays, the production of cable trays, the delivery and laying of cables, and the supply of additional material. |
107 | ARCELORMITTAL ZENICA | 2013 | Repair and extension of software for coke oven gas reconstruction According to this agreement, the repair and extension of the software was performed on the coke gas torch reconstruction operations. |
108 | OPĆINA ŽIVNICE | 2013 | Preparation of the Main Project for Securing the "Šerici" Road Crossing in KM 125 + 498 Railway (Brčko) Bukovac - Bosanska Poljana - Banovići Within the framework of this contract, the preparation of the Main Design for the insurance of the Šerici road crossing in KM 125 + 498 of the railway line (Brčko) Bukvac - Bosanska Poljana - Banovići was made. |
109 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2013 | Change correction on the visualization system at AMK Under this agreement, a correction was made to the visualization system at AMK. |
110 | ARCELORMITTAL ZENICA | 2013 | Reconstruction of Coke Gas Torch Software As part of this spell, the repair and extension of the software for the reconstruction of the coke gas torch was carried out. |
111 | TERMOELEKTRANA TUZLA | 2013 | Supplies and spare parts for plants and plants of TPP "TUZLA" Tuzla Within this contract, supplies and spare parts for the plants and plants of TPP "TUZLA" in Tuzla were delivered. |
112 | ARCELORMITTAL ZENICA | 2013 | Maintenance of measuring equipment Under this contract, all measuring equipment was maintained at the Koksar plant at AMZ. |
113 | TERMOELEKTRANA TUZLA | 2013 | Delivery of materials and spare parts for automation for the needs of the Tuzla Thermal Power Plant Branch Tuzla Within the scope of this contract, the supply of materials and spare parts for automation was made for the needs of the Tuzla Thermal Power Plant Branch in Tuzla. |
114 | ELEKTROPRENOS BIH O.P. MOSTAR | 2013 | Spare parts for maintenance of SCADA equipment, automation and information systems Within the framework of this contract, the delivery of spare parts for maintenance of SCADA equipment, automation and information systems was performed. |
115 | ALSTOM POWER GMBH | 2013- | Hardware and Software Support for DCS Medupi (South Africa) Under this agreement, the engineers of ELCOM d.o.o. Tuzlarade at two locations: Alstom Mannheim (Germany) and Alstom Massy (France). Under this contract, our engineers are hardware and software support from Alstom Power GmbH for the DCS Medupi project, South Africa. |
116 | TERMOELEKTRANA TUZLA | 2014 | Delivery of fuses, contacts, relays and switches Within the framework of this contract, the supply of fuses, contacts, switches and other material for the needs of the Tuzla Thermal Power Plant was delivered. |
117 | ZD RUDNICI „KREKA“ DOO TUZLA | 2014 | Thermal and time relays, ridge switches and pushbuttons Within the scope of this contract, thermal and time relays, reef switches, pushbuttons and other materials for the needs of ZD Rudar "Kreka" Ltd. were delivered. Tuzla. |
118 | „HIDROELEKTRANE NA NEREVI“ JALBANICA | 2014 | Procurement of parts for control and excitation of aggregates for the needs of the Jablanica Hydroelectric Power Plant Jablanica Within the framework of this contract, procurement and delivery of components for the management and excitation of aggregates were carried out for the needs of the Jablanica HPP Jablanica Hydro Power Plant Jablanica. |
119 | ARCELORMITTAL ZENICA | 2014 | Design and repair of 5t crane in ammonium sulfate section Within the scope of this contract, the main electrical design of the crane, procurement and installation of electrical equipment, automation of the crane in sulfate, anti-corrosion protection of the crane and repair of concrete paths were made. |
120 | ARCELORMITTAL ZENICA | 2014 | Design, procurement and installation of a coke detector Within the framework of this contract, the design, delivery and installation of equipment for detection and automatic extinguishing of coke on the basis of Raytek Thermo View camera, testing and commissioning of the system with training of personnel for work on the system were performed. |
121 | TERMOELEKTRANA TUZLA | 2014 | Procurement of materials and spare parts for maintenance of automatic units 4 and 5 Within the framework of this contract, the supply of materials and spare parts for maintenance of automation of units 4 and 5 was carried out for the needs of the Tuzla Thermal Power Plant Branch Tuzla. |
122 | TERMOELEKTRANA TUZLA | 2014 | Supplies for regular maintenance of plants and plants Within the framework of this contract, the supply of consumables for the regular maintenance of the facilities and facilities of the Tuzla Thermal Power Plant Branch was made. |
123 | JP ELEKTROPRIVREDA BIH D.D. SARAJEVO | 2014- | Replacement of aggregate management systems and equipment no. 1 and 2 HPP Grabovica for the Needs Hydro Power Plant Branch Jablanica Within the framework of this contract the following will be executed: Project Design, Audit and Design of the Implementation Project; Factory works and testing of equipment and delivery of equipment: control units of units 1 and 2 and control system of common functions of the power plant (PPLC); advanced training of the Client's staff; Preparation and delivery of technical documentation; Work on the power plant (installation, final testing and commissioning). |
124 | KEK-ENERGETSKA KORPORACIJA KOSOVA | 2015 | Equipment revitalization at Kosovo B TPP, Coal Separation Depot This contract includes: Delivery of equipment (panels, computers, air conditioners, limit switches, inductive sensors, converters for 6kV cable reel; converters for control of 0.4kV cable reel; replacement of HARDWARE and Software; delivery of cables; 315 kW motor cage rotor; 6 kV, 55 kW motor cage rotor, 0.4 kV, 200 kW motor cage rotor, 6 kV; Installation, supervision, commissioning, engineering, delivery of technical documentation, staff training. |
125 | TERMOELEKTRANA TUZLA | 2014-2015 | Delivery of fittings for 2014 Within the framework of this contract, the supply of armature was made for the use of the Branch of the Tuzla Thermal Power Plant Tuzla. |
126 | ARCELORMITTAL ZENICA | 2015 | Maintenance of measuring equipment Within the framework of this contract, the automation control system of the Siemens manufacturer in the Koksara Department was maintained. |
127 | JP ELEKTROPRIVREDA BIH D.D. SARAJEVO | 2015 | Design of the Electro part of the Main design of the system of landfill and ash landfill spraying required by TPP Kakanj Within the framework of this contract, the Electro part of the Main Design of the slag and ash dump landfill spraying system for the second, third and fourth stages of landfill development was carried out for the needs of TE Kakanj. |
128 | JP ELEKTROPRIVREDA BIH D.D. SARAJEVO | 2015 | Establishment of a facility management production center under the jurisdiction of ED Bihać, equipped with state-of-the-art IT tools for monitoring and control (SCADA) Within the framework of this contract, the PLC devices of the Modicom Quantum type (Schneider Electric) and the converter protocol (Prolinx) were set up in order to collect data from the HPP Una Kostel plant and further forward it to the Proza NET SCADA system, then functional testing, SAT and commissioning were performed. SCADA system operation) |
129 | ENERGOINVEST | 2015 | Control system for ash boiling plant under silo Delivery, installation, connection and commissioning of the control and visualization systems were carried out under this Agreement. |
130 | JP ELEKTROPRIVREDA BIH D.D. SARAJEVO | 2015 | Delivery of electricity meters in TPP Tuzla Within the framework of this contract, the supply of electricity meters was made for the needs of the Tuzla Thermal Power Plant Branch Tuzla. |
131 | TERMOELEKTRANA KAKANJ | 2015 | Delivery of measuring and control equipment for Block 5-110 Within the framework of this contract, delivery of regulation equipment for Unit 5-110 was made for the needs of the Branch of the Kakanj Thermal Power Plant Kakanj |
132 | TERMOELEKTRANA TUZLA | 2015 | Material and spare parts for maintaining automation of blocks 3 and 6 Within the framework of this contract, the supply of materials and spare parts for maintenance of automation of units 3 and 6 was carried out for the needs of the Tuzla Thermal Power Plant Branch Tuzla |
133 | TERMOELEKTRANA KAKANJ | 2015 | Procurement of parts for emission and imission equipment for TE Kakanj Within the framework of this contract, the parts of the emission and imission equipment were delivered for the needs of the Kakanj Thermal Power Plant Branch Kakanj |
134 | TERMOELEKTRANA TUZLA | 2015 | Procurement of consumables and spare parts for regular maintenance of plants and plants Within the framework of this contract, the supply of consumables and spare parts for the regular maintenance of the plants and plants for the needs of the Tuzla Thermal Power Plant Branch was performed. |
135 | TERMOELEKTRANA TUZLA | 2015 | Procurement and installation of Lake II alarms and video surveillance systems Within the framework of the contract, delivery and installation of alarm system of video surveillance system of Lake II slugs were carried out for the needs of the Branch of the Tuzla Thermal Power Plant Tuzla |
136 | ARCELORMITTAL ZENICA | 2015 | Reconstruction of cantilever crane 5t on CCM foundry platform Within the framework of this contract, the design, procurement and delivery of materials and equipment, installation and commissioning of the crane were performed, all according to the job list and technical description for the selected Option no. 1 as-Main power supply cabinet installed on crane - Overhaul cabinet - Cabinet for lighting, lighting, sockets, sound and light signaling - Towing box on crane / cat. |
137 | GLOBAL ISPAT KOKSNA INDUSTRIJA d.o.o. LUKAVAC | 2015 | Server delivery, installation and setup of software to visualize and manage the production process at AMK Within the framework of this contract, the delivery of servers, clients and engineering station was performed, then the software for visualization and production management of the AMK factory was completed, and the complete management system of the AMK uGlobal Ispat Koksnoj Industrija d.o.o. plant was commissioned. Lukavac. |
138 | ENERGOINVEST | 2015 | Reconstruction of the ash collection vessel on Unit 6 in TPP Tuzla Within the framework of this contract services, works and delivery of equipment in accordance with the request and description of fluidization of the collecting hopper on the pneumatic ash transport system of Unit 6 at TPP Tuzla were performed. Then, the project documentation for the management of the collecting vessel was completed, the delivery and installation of the required electrical cable, Software application changes and modifications to the SCADA system, testing, testing and commissioning. |
139 | KOSTT | 2015 | Revitalization of control cabinets in SS Kosovo B - “Rehabilitation of control boxes in SS Kosovo B” This contract has rehabilitated the control cabinets of SS Kosovo B. The cabinets that need to be revitalized are distribution boxes and control boxes AT1 and AT2 and control cabinets in OHL205 / 1, OHL293 / 1 and AT1 cabins 220kV. SS of Kosovo B is one of the substations with the largest transformer capacity in Kosovo and is of particular importance where we will replace the control and distribution cabinets on the AT1, AT2, OHL205 / 1 and OHL293 / 1 beds as well as the installation of auxiliary power, control and signaling cables on OHL205 / 1, OHL293 / 1 iAT1 side 220kV. |
140 | OPĆINA BUŽIM | 2016 | Procurement and installation of high-current installations and telemetry systems of the Pivnica Pumping Station system Procurement and installation of disinfection / chlorination system at the Pivnice pumping station Procurement and installation of equipment and installation at the Pivnice pumping station |
141 | ARCELORMITTAL ZENICA | 2016 | Revitalization of cranes at Slag court |
142 | TERMOELEKTRANA KAKANJ | 2016 | Automation of operation of sand filters and decarbonisation in the Branch of Kakanj Thermal Power Plant Kakanj |
143 | POBJEDA DD TEŠANJ | 2016 | Testing, tuning and commissioning of the molding line at Turbe Foundry |
144 | TERMOELEKTRANA TUZLA | 2016 | Inspection and testing of the control system of the power unit of Unit 3 for the needs of TPP Tuzla Tuzla |
145 | TERMOELEKTRANA KAKANJ | 2016 | Procurement and installation of a backup cabinet for a tipper station for the needs of JP Elektroprivreda BiH d.d. - Branches of Kakanj Thermal Power Plant Kakanj |
146 | TERMOELEKTRANA TUZLA | 2016 | Project of separation of joint consumption from own consumption facility of TPP Tuzla |
147 | TERMOELEKTRANA TUZLA | 2016 | Replacement of the steel structure of the wagon turner No.2 at the Tuzla Thermal Power Plant |
148 | ELEKTROPRENOS-ELEKTROPRIJENOS BIH a.d | 2016 | Procurement and installation of equipment and materials, preparation of project documentation and works on reconstruction of TS 110 / x kV KONJIC with obtaining necessary approvals and permits |
149 | TOM-CAT d.o.o. Tuzla | 2016 | Rehabilitation of Modrac Dam - Phase III, related to: Procurement and installation of Modrac Dam Observation Equipment in rehabilitated condition |
150 | TERMOELEKTRANA TUZLA | 2016 | Management system services for 6 and 0,4kV power plants at TPP Tuzla |