aolamazon.comyahoobaidugoogle
Warning: session_start(): Cannot send session cookie - headers already sent by (output started at /home/elcom/public_html/index.php:1) in /home/elcom/public_html/libraries/joomla/session/session.php on line 423

Warning: session_start(): Cannot send session cache limiter - headers already sent (output started at /home/elcom/public_html/index.php:1) in /home/elcom/public_html/libraries/joomla/session/session.php on line 423

Warning: Cannot modify header information - headers already sent by (output started at /home/elcom/public_html/index.php:1) in /home/elcom/public_html/libraries/joomla/session/session.php on line 426

Warning: Cannot modify header information - headers already sent by (output started at /home/elcom/public_html/index.php:1) in /home/elcom/public_html/plugins/system/jfrouter.php on line 316

Warning: Cannot modify header information - headers already sent by (output started at /home/elcom/public_html/index.php:1) in /home/elcom/public_html/plugins/system/jfrouter.php on line 317

Warning: Cannot modify header information - headers already sent by (output started at /home/elcom/public_html/index.php:1) in /home/elcom/public_html/plugins/system/jfrouter.php on line 318
Agrana Brčko Sugar Refinery
Bosnia(BA)English (United Kingdom)
Print
PDF

Agrana Brčko Sugar Refinery

 

Projecting, programming, delivery, assemblage and setting into motion of plant for steam production– Boiler 30 t/h steam

 

TECHNICAL DESCRIPTION


- Finishing of the existing PLC program and system for visualization of the plant for steam production in Studen Agran Factory.

- Delivery of new PC operating cell with 19’’ monitor with minimal characteristics: 2GHz dual core, 1GB RAM, HDD 100Gb, HMI Software (WiCC v7.0) and license for HMI software for OS cell.

- To align working algorithm of the existing PLC program with the technological P&D diagram and control sequences.

- Modify software regulators in PLC program so as to existing SIPART regulators could be scrapped.

- Managing with spreader rollers (3 pieces) change in the sense that controlling is done individually instead of the current group control with all three drives at the same time.

- Modify the communication with PROFIBUS with filter plant (s7-200 PLC with installed EM277 commanding processor).

- Modify the communication with PROFIBUS with DCS Sugar Plant system (EMERSON Delta V). Modify the communication just by the boiler through the DP/DP caplers.

- Programme the two ways of reacting in case of loss of main power supply. Distinguish normal work and repair work.

- Add controlling system with three new ash carriers.

- Add controlling system with machine for coal spacing in coal bunker.

- Modify the connection with Diamond cabinet (new system with self-control) on the boiler.

- Add the two-way working possibility for spreader plant. The plant in local mod control without holding.

- Secondary ID fan will be controlled with new frequency regulator through PROFIBUS.

- Do the HMI application into WinCC v7.0.

- Do the HMI application on two languages (English and Bosnian).

 


Thumbnail image Thumbnail image Thumbnail image
Thumbnail image Thumbnail image Thumbnail image